Since our last update, the kiddie fence has been installed as well as the electrical system.   As far as I know, the Diamond Brite pool finish is the next step after the electic passes inspection.  It shouldn’t be much too much longer.

We also obtained the services of a landscaper who came highly recommended.  He’s working in tandem with pool construction folks to get our irrigation system back up and running and getting the right plants and landscape for the surrounding pool area.

This is going to look really cool when it’s done.

IMG_4533-800.jpg
IMG_4615-800.jpg
 